The Brief

Kingsway House is a £6.4m retrofit of a nine-storey residential tower block in Latchford, Warrington, delivered for Torus with contractor HMS. Completed in March 2024, the three-year project transformed the retained 1960s building into 53 modern social-rent apartments, including two additional ground-floor homes.

Supported by the Social Housing Decarbonisation Fund, the refurbishment combined external wall insulation, replacement windows and doors, an insulated roof and communal air-source heating with internal remodelling, new balconies, replacement lifts and improvements to communal spaces and landscaping.

Revitalising a landmark and improving everyday life.

Transforming Kingsway House into 53 warmer, more accessible homes, combining a distinctive new identity with lower energy demand and better spaces for everyday life.

Our Role

BTP acted as Lead Architect and Retrofit Designer through RIBA Stages 0–7, developing a whole-building retrofit strategy and coordinating the architectural proposals with the wider project team. 

We brought together improvements to the building fabric, low-carbon heating, accessibility and internal accommodation, addressing the interfaces between new systems and the retained structure. Our work included consultation with residents and collaboration with Torus, contractor HMS and a specialist project team. 

Our involvement continued into Stage 7, using post-occupancy evaluation and resident feedback to understand how the refurbished homes performed in everyday use. 

Before and after

A new lease of life for the outdated block, with safer, warmer homes.

Design development

Retaining the existing tower required us to consider the building as a whole, coordinating thermal improvements with internal alterations, building services and fire-safety measures. A fabric-first approach combined external wall insulation, high-performance windows and doors and a new insulated roof covering to reduce heat loss before introducing low-carbon heating. 

Integrating a communal air-source heat pump system into an existing high-rise building required early coordination between architectural, building services, retrofit and fire-safety specialists. Developed under PAS 2035 principles, the installation was supported by a detailed acoustic assessment to address potential noise effects on residents and neighbouring properties. 

Within the apartments, we developed open-plan living layouts alongside refurbished kitchens and bathrooms. Resident consultation informed the kitchen arrangements and helped shape practical decisions about how the homes would be used. The creation of two additional ground-floor apartments increased the building’s accommodation from 51 to 53 homes. 

New passenger lifts improved accessibility, while private balconies extended residents’ living space outdoors. We coordinated these interventions with renewed communal areas, parking and green spaces, considering both the individual homes and the building’s relationship with its surroundings. 

Planning substantial works around residents required careful coordination of access, safety and disruption. Bringing the fabric upgrades, heating installation, internal refurbishment and accessibility improvements into one programme reduced the need for repeated interventions. Residents also contributed to landscaping and communal-space proposals, helping the design respond to their priorities.

A sustainable future through retrofit

Our fabric-first approach combined external wall insulation, upgraded windows and doors and an insulated roof with communal air-source heating.

Together, these measures reduced energy demand, with residents reporting warmer, quieter homes and more consistent temperatures.

Rooted in local character

Tree-inspired stencilling gives Kingsway House a distinctive identity.

Drawing cues from the local vernacular and surrounding landscape, the tree motif creates a recognisable visual identity for the building, integrating its branding into the architectural design.

Outcomes

Kingsway House demonstrates how comprehensive retrofit can extend the life of an existing residential tower while improving its accommodation, energy performance and accessibility. 

Post-occupancy evaluation found improved thermal comfort and more consistent internal temperatures, with residents reporting warmer, quieter and more comfortable homes. The upgraded building fabric and communal air-source heating system reduced energy demand, supporting lower running costs. 

New balconies, improved communal facilities and renewed landscaping have changed how residents experience the building, providing more opportunities to spend time outdoors and meet neighbours. Retaining the existing structure has brought an ageing housing asset back into long-term use, delivering 53 upgraded social-rent homes through a coordinated programme of architectural and technical improvements. 

Stephen Simm

Torus

"BTP brought extensive retrofit and high-rise expertise to the transformation of Kingsway House. Their collaborative approach, particularly their engagement with residents and project partners, helped us deliver warmer, more energy-efficient and accessible homes while minimising disruption throughout the works."

  • Read bio
    Director

    Elliot Denby

    BA(Hons), M.Arch, RIBA, ARB

    Director

    Elliot Denby

    BA(Hons), M.Arch, RIBA, ARB

    I qualified as an Architect in 2017 joining BTP the same year, was promoted to Associate in 2019 and became a Director in 2023.

    Since joining BTP, I’ve led projects from concept through to completion, ranging from large-scale housing developments to refurbishment and high-rise fire remediation. These include an award-winning 34-home affordable housing scheme in Wythenshawe and successful Gateway 2 applications for Hatton Gardens in Liverpool and The Blake in Southampton. I’ve also built a strong relationship with a major national contractor, delivering high-rise remediation and refurbishment projects across England and Scotland.

    As an accredited Building Regulations Principal Designer, I have a particular interest in building safety and compliance. My strengths lie in job running, detailed design and project management, helping projects progress smoothly and meet the required standards.

    Outside of work I enjoy spending time with my family, travelling where possible to explore different cultures and running recently completing the Great North Run 2025 and London Marathon in 2026.

  • Read bio
    Architectural Assistant

    Alin Pal

    BSc (Hons), M.Arch.

    Architectural Assistant

    Alin Pal

    BSc (Hons), M.Arch.

    I joined BTP in 2018 as a Part 1 Architectural Assistant and have since completed my master’s degree in architecture. I’m now working towards my Part 3 qualification, with experience across new-build housing, retrofit, retirement living and high-rise remediation.

    My projects include a 50+ unit extra care home, Bowland House 17-storey high-rise remediation and 70 unit Booth Street housing scheme in Stoke. I also lead BTP’s CGI and animation studio, creating architectural visualisations that help clients understand and explore their projects.

    Outside work, I enjoy travelling, exploring new places, photography, and spending quality time with friends and family.

  • Read bio
    Architectural Assistant

    Amy Greenwood

    BA(Hons), M.Arch

    Architectural Assistant

    Amy Greenwood

    BA(Hons), M.Arch

    Enjoying the work / life balance of a supporting role, I have chosen to remain an architectural assistant and job runner. Having been at BTP since 2008 I have worked with most of the architects over the years. In doing so I have gained experience, knowledge and skills in each of our main sectors, including residential, ecclesiastical, conservation, remediation, judicial and custodial projects.

    Outside of work, my teenage sons keep me busy, I enjoy encouraging their passions whether that be cheering at a football match or listening to them about game design. When I get a moment to myself, you'll find me listening to an audio book, tending the garden.

Collaborators Learn more
  • Contractor

    View Details +

    HMS

  • Partner

    View Details +

    Warrington Borough Council

  • Cheshire Fire and Rescue Services

    View Details +

    Fire Engineer

Ready to create something together?

Get in touch